Complete renovation: where the work should actually start
← Back to the blog

21/08/2026 · JOAO VITOR WOICIKOSKI BENASSI

Complete renovation: where the work should actually start

In a complete renovation, the order of the phases matters more than the speed. What sits behind the wall decides what can still be done later, and changing your mind after the building work is already closed up costs far more than deciding properly at the start.

The work nobody sees first

Before any finishing work begins, we deal with what is hidden: electrics, plumbing, levelling the floor and walls, and whatever needs to be demolished. In an old Dutch house, this phase usually holds a surprise: corroded pipes, wiring without an RCD, a wall that is not as straight as it looks.

  • Demolition and waste removal
  • Levelling of floor and walls
  • Complete electrics, with new wiring
  • Complete plumbing, with no patching of old pipes

Only once this part is closed does it make sense to talk about plastering, tiling and painting.

Why deciding early is cheaper

Every change of mind has a price, and that price grows as the build progresses. Moving a socket before the wall is closed is quick. Moving it after the plaster is done means opening up something that was already finished.

Our way of avoiding that: we present the quote with materials and labour listed separately, so you can decide clearly before the work starts, not halfway through it.

What you don't see is what decides the final price.

One team, not a queue of subcontractors

We have delivered complete homes, including one of seventeen rooms. What changes between a small project and a large one is not the technical difficulty, it's the coordination: how many different people need to understand each other without anything falling out of order.

Because the whole job stays with the same team, the tiler knows when to start because the plumber is on the same team. Nobody waits on a phone call from a third party.

How long does a complete renovation take?

It depends on the size of the house and how much changes in the structure. A renovation that touches walls and installations takes longer than one that only replaces the finishes. This goes into the schedule we present before starting.

Can I keep living in the house during the work?

For parts of the build, yes. For others, mainly during demolition and installation work, it's best to clear the space. We discuss this case by case, within the planning.

Want to know what your renovation will specifically require? Talk about your project or see more detail on the complete renovation page

Want to discuss a project?

Working in Eindhoven (base), Den Bosch, Amsterdam, Hoofddorp,The Hague, Utrecht and Almere.

Request a quote  ↗
Bedankt. Wij nemen binnenkort contact met u op.Thank you. We will contact you soon.Obrigado. Entraremos em contato em breve.